CFE – PDTE HYDROELECTRIC PLANT. PLUTARCO ELIAS CALLES “EL NOVILLO”

CFE – PDTE HYDROELECTRIC PLANT. PLUTARCO ELIAS CALLES “EL NOVILLO”

Rehabilitation and Repowering of Units 1 and 2 at 55.6 MVA, 13.8 KV and power factor of 0.90 in delay, with class F insulation.

The general scope of work includes the following:

  • Supply of complete winding type Roebel Bars.
  • Stator Core Lamination Supply.
  • Neutral transformer supply.
  • Existing winding disassembly service.
  • Existing core disassembly service.
  • New core rolling assembly service.
  • New winding assembly service.
  • Rotor pole disassembly service.
  • Rotor pole re-insulation service.
  • Rotor pole assembly service.
  • Generator commissioning and efficiency tests.