ICE - TORO I HYDROELECTRIC PLANT, COSTA RICA

ICE – TORO I HYDROELECTRIC PLANT, COSTA RICA

Supply and assembly of 144 diamond coils and stator core for the 13.65 MVA, 13.8 KV, 720 RPM electric generator of Unit 1 of the Toro I Hydroelectric Power Plant located in Costa Rica.

The general scope of work includes the following:

  • Supply of 144 diamond coils.
  • Lamination supply for stator core.
  • Current winding replacement service.
  • Assembly service of the new winding.
  • Current core replacement service.
  • Assembly service of the new lamination for the new core.
  • Execution of electrical acceptance and reference tests

ICE – PLANTA HIDROELÉCTRICA TORO I, COSTA RICA

01_FINAL
06_FINAL
03_FINAL
09_FINAL
07_FINAL
10_FINAL
02_FINAL
11_FINAL
04_FINAL
05_FINAL
12_FINAL
13_FINAL
24_FINAL
08_FINAL
16_FINAL
17_FINAL
29_FINAL
15_FINAL
01_FINAL 06_FINAL 03_FINAL 09_FINAL 07_FINAL 10_FINAL 02_FINAL 11_FINAL 04_FINAL 05_FINAL 12_FINAL 13_FINAL 24_FINAL 08_FINAL 16_FINAL 17_FINAL 29_FINAL 15_FINAL
Contact us in WhatsApp